top of page

ABOUT PROJECT

•Standardize current system
–Stabilize the supply amount to stations
•Decrease the human factor
–Implement consistent systems such as AGV
•Reduce the total cost
–Remove the unnecessary elements
•Increase the efficiency
Our Problem;
• Material transferring of Line 6;
• Low Percentage of Fill Rates
–Average fill rate is 64.1%
–Transportation flow is not efficient
• Transportation with exceeding capacity
–Damage of the boxes
–Threatens job safety
• Extra boxes in side areas of production
–Affects the efficiency of workability
–Creates traffic
Problem Definition
Objectives
Outcomes



-
Implementation of Automated Guided Vehicle(AGV) system in the production area
-
Obtain an unmanned transportation system in the company
-
Increase the utilization of the transport vehicles
bottom of page